The inspection body of type C to "TriEl" ltd, is. a separate independent structural unit within the company. The control body is accredited by the Executive Agency “Bulgarian Accreditation Service” according to BDS EN ISO/IEC 17020:2012. and has an ACCREDITATION CERTIFICATE reg. number 173 OKS valid until 2027 ., according to BDS EN ISO / IEC 17020: 2012.”.

The Inspection Body at TriEl carries out activities for control in new and/or in operation objects and facilities in the following areas:

  • Electrical switchgear and equipment up to and over 1000 V

  • Power and instrument transformers up to and over 1000 V

  • Apparatuses, relays, secondary wiring and electrical installations for voltage up to 1000 V

The controlled parameters for each area are shown in Accreditation Order "A221 2023"

Highly qualified specialists with proven theoretical and practical knowledge are a prerequisite for the professional and correct execution of control activities., as well as modern equipment, calibrated in Bulgarian and European laboratories, accredited under BDS ISO/IEC 17025.

Technical resources

Three-phase relay protection tester FREJA 300

Automated testing of relay protections

Multifunctional tester Omicron CPC 100

-Automated testing of current and voltage measuring transformers
-Automated testing of power transformers
-Measurement of contact resistance and winding resistance
-Primary and secondary testing of relay protections

Insulation resistance tester KYORITSU 3125

Insulation resistance measurement with voltage up to 5000 V

Earthing resistance tester KEW 4106

Measurement of resistance of grounding and lightning protection installations

Electrical installations tester . KYORITSU 6050

-Measuring of a Phase-Protective conductor loop
-Mesuring of operating current and time of RCD protections
-Touch voltage measurement

Digital microohmmeter M2420A

Contact resistance measurement in range 1 mOhm – 200 Ohm

Request for control

You can send a request for control to the Head of the Control Authority on site at the company's office or by filling out and sending a Control Request FK 701-1

Complaints and objections

Every client/interested party has the right to submit a written complaint or objection in connection with the control activities carried out by Independent Control Body type C to "TriEl" ltd on site at the company's office. Complaints or objections are considered within one week from the date of their receipt, according to the Control Body type C management system. A written response is given to the person or organization, filed the complaint or objection, according to Feedback Card FK 706-1